![]() For any periods beyond those specifically permitted by (e)(2), an approved deviation addressing the requirements in (e)(5) is required. (3) Deviations are not required for the aforementioned circumstances provided the entire period of performance, to include options and phase-in periods for the acquisition are justified and approved in the original written acquisition plan or procurement strategy meeting (PSM) by the appropriate approving authority, e.g., Assistant Administrator for Procurement approval is required for PSMs held at Headquarters. (iii) Periods of up to 6 months beyond the 5-year period of performance limitation when permitted by FAR Clauseĥ2.217-8, Option to Extend Services, for unplanned, unforeseen circumstances or events that are beyond the control of the contracting officer, such as a protest, provided that the option is exercised consistent with the limits outlined in Phase-in periods may be in addition to the 5-year period of performance limitation. (ii) Phase-in periods of up to 90 days where required for the efficient transition of contracting activities for a period that is concurrent with the predecessor contract in accordance with the use of FAR Clauseĥ2.237-3, Continuity of Services. For those acquisitions where it is justified to procure Phases A through D or A through F and the period of performance is expected to exceed 5 years, a deviation is not required if the period of performance is approved as part of the original acquisition plan and the work included in the scope of the contract. It is NASA policy to procure Phase E and F efforts separately from Phase A through D to allow for the maximum number of industry opportunities to compete for awards so long as awards to different contractors will not pose critical integration risks to NASA. The period of performance for DDT&E should be consistent with the time needed to complete system development or for hardware production efforts to perform Phase A (concept studies, concept & technology development phase), Phase B (preliminary design & detailed engineering/technology completion phase), Phase C (final design, components/systems fabrication and testing phase), Phase D (system assembly, integration, testing, and launch phase), Phase E (systems and mission operations, sustaining engineering, maintenance support), and Phase F (close-out/decommissioning efforts). ![]() (i) Acquisitions for the design, development, test, and evaluation (DDT&E) of end-item systems development and/or hardware production. (2) The 5-year period of performance limitation in paragraph (e)(1) does not apply to the following circumstances: ![]() Seeġ816.505-71 for limitations on the ordering period of task and delivery order contracts. basic ordering agreements, blanket purchase agreements), interagency acquisitions, and orders placed under agreements or awarded under a Federal Supply Schedule or other indefinite delivery/indefinite quantity contracts awarded by other agencies. (e)(1) The 5-year period of performance limitation (basic plus option periods) applies to all NASA contracts regardless of type and other procurement award instruments, except as stated in (e)(2). (g)(2) The procurement officer is authorized to approve option quantities greater than 50 percent. Requests for approval shall be signed by the procurement officer and shall include a description of the acquisition, identification of anticipated contract costs and funding, and a determination, with supporting rationale, that each of the criteria inįAR 17.105-1(b) is met by the proposed use of multiyear contracting. (b) The Assistant Administrator for Procurement, Program Operations Division, is the approval authority for the use of the multiyear contracting technique. The SEWP contracts have an outstanding track record for offering a vast selection and wide range of advanced technology to all Federal Agencies and their authorized contractors.1817.207-70 Analysis to support exercise of options.ġ817.208 Solicitation provisions and contract clauses.ġ817.503-70 Order requirements and provisions.ġ817.7001 Down-selections in phased acquisitions. Technology by providing state-of-the-art commercial hardware, software, services and solutions. SEWP V is a Government Wide Acquisition Contract (GWAC) that supports Government requirements for high-performance. Far Part 16.505 B is applicable to this contract. Note: It is preferred that orders be accompanied by the SEWP Fax Cover SheetĪll Delivery Orders over $5 Million must include the SEWP Fair Opportunity Form or equivalent information with the Deliver Order. All delivery orders are processed within one business day of receipt, and are electronically forwarded to the Contract Holder by the SEWP PMO. All Delivery Orders should be submitted by the customer to the SEWP PMO office via fax 30 or email to in a PDF or Image File.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |